Search Results for "JVET-R0481"
Found 4 document(s)
Use number, keyword, author, or MPEG number. Filter by meeting when needed.
JVET-R0481 AHG2: Editorial input of integrated text for HLS adoptions [Y.-K. Wang (Bytedance), R. Sjöberg (Ericsson)] [late]
This was reviewed in the closing plenary of Friday 24 April at 1500 (chaired by GJS & JRO) and confirmed to appear to represent the actions of the meeting.
The integration of JVET-R0410 item 10 was suggested to potentially need some refinement.
Using the bug tracker was suggested for any issues noticed in the interpretation of recorded actions.
It was remarked that there is an issue in the conditions for signalling the mvd_l1_zero_flag in the document relative to JVET-R0324. It was agreed to resolve the question after the meeting. See the post-meeting note on this subject in the discussion of JVET-R0410.
Review of editors’ notes in texts:
- Decision (cleanup): Allow the value 6 for chroma sample location type indicators when present.
- Decision (cleanup): Add a byte to the decoded picture hash SEI message with a single_component_flag followed by 7 reserved zero bits. The width and height of each component are defined externally.
- For the decoded picture hash, the two’s complement issue is also found in HEVC. This should be further studied.
- Decision (cleanup): When used with a RWP SEI message, the generalized cubemap message shall have the same functionality as the “traditional” cubemap message (define by syntax element constraints)
- Decision (cleanup): (pt_)display_elemental_periods_minus1: specify as u(4).
Test conditions (3)
Contributions in this category were discussed Monday 20 Apr. 1300–1340 in Track B (chaired by JRO).
JVET-U0003 JVET AHG report: Test model software development (AHG3) [F. Bossen, X. Li, K. Sühring, K. Sharman, V. Seregin, A. Tourapis]
The mandates given to the AHG were:
- Coordinate development of test model (VTM, HM, SCM, SHM, HTM, MFC, MFCD, JM, JSVM, JMVM, 3DV-ATM, and HDRTools) software and associated configuration files.
- Produce documentation of software usage for distribution with the software.
- Enable software support for recently standardized additional SEI messages.
- Discuss and make recommendations on the software development process.
- Propose improvements to the guideline document for developments of the test model software.
- Perform tests of test model behaviour using common test conditions.
- Suggest configuration files for additional testing of tools.
- Investigate how to minimize the number of separate codebases maintained for group reference software.
- Coordinate with AHG on Draft text and test model algorithm description editing (AHG2) to identify any mismatches between software and text, and make further updates and cleanups to the software as appropriate.
- Coordinate with AHG6 for integration with 360lib software.
The software model versions prior to the start of the meeting were:
- VTM 11.0 (Nov. 2020)
- HM-16.22 (Jul. 2020)
- HM-16.21+SCM-8.8 (Mar. 2020)
- SHM 12.4 (Jan. 2018) [svn]
- HTM 16.3 (Jul. 2018) [svn]
- JM 19.0
- JSVM 9.19.15
- JMVC 8.5
- 3DV ATM 15.0 (no version history)
- HDRTools 0.19.1 (Sep. 2019)
Software for MFC and MFCD is only available in the version published by ITU-T and ISO/IEC. It is planned to create repositories with the latest versions available in ITU-T H.264.2 (02/2016)....
JVET-R2016 Summary information on BD-rate experiment evaluation practices [K. Andersson, F. Bossen, J.-R. Ohm, A. Segall, R. Sjöberg, J. Ström, G. J. Sullivan, A. Tourapis] (2020-05-15)
Minor refinements of the description were planned.
Future meeting plans, expressions of thanks, and closing of the meeting
Future meeting plans were established according to the following guidelines:
- Meeting under ITU-T SG 16 auspices when it meets (ordinarily starting meetings on the Tuesday of the first week and closing it on the Wednesday of the second week of the SG 16 meeting – a total of 9 meeting days), and
- Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (ordinarily starting meetings on the Wednesday prior to such meetings and closing it at lunchtime on the last day of the WG 11 meeting – a total of 9.5 meeting days).
In cases where an exceptionally high workload is expected for a meeting, an earlier starting date may be defined.
Some specific future meeting plans (to be confirmed) were established as follows:
- Mon. 22 June – Wed. 1 July 2020, 19th meeting under ITU-T auspices conducted by teleconference.
- Wed. 7 – Fri. 16 October 2020, 20th meeting under WG 11 auspices in Rennes, FR.
- Wed. 6 – Fri. 15 January 2021, 21st meeting under WG 11 auspices in Capetown, ZA.
- Tue. 20 – Wed. 28 April 2021, 22nd meeting under ITU-T auspices in Geneva, CH.
The agreed document deadline for the 19th JVET meeting was planned to be Wednesday 10 June 2020 (earlier than usual).
Vittorio Baroncini, Andrew Segall, Mathias Wien, and Yan Ye were thanked for their efforts in further...