Search Results for "JVET-Q0404"

Found 5 document(s)

Search documents

Use number, keyword, author, or MPEG number. Filter by meeting when needed.

17th Meeting: Brussels, January 2020 2019-12-31 17:40
Abstract
This contribution proposes several options to specify an extraction process for subpictures that allows a CBR mode after extraction.
JVET-Q0404 AHG12: On CBR subpicture extraction [R. Skupin, Y. Sanchez, K. Sühring, T. Schierl (HHI)]

This contribution was discussed Wednesday 15 January at 1900 in Track A (chaired by GJS). It had not been reviewed in the HLS BoG.

It proposes a way to associate filler data NAL units and filler payload SEI messages with subpictures. It was noted that these already have an association defined for association with VCL NAL units, and this should be sufficient to associate them with subpicture regions. Using this association and adding a CBR flag for the subpicture level information SEI message should be sufficient. The extraction process should account for the association. Decision (BF/cleanup): Adopt CBR flag and semantics and extraction process as described. Text is to be integrated into revision of JVET-Q0397.

References:
JVET-Q0397
Decisions
adopted
It proposes a way to associate filler data NAL units and filler payload SEI messages with subpictures. It was noted that these already have an association defined for association with VCL NAL units, and this should be sufficient to associate them with subpicture regions. Using this association and adding a CBR flag for the subpicture level information SEI message should be sufficient. The extraction process should account for the association. Decision (BF/cleanup): Adopt CBR flag and semantics and extraction process as described. Text is to be integrated into revision of JVET-Q0397.
Citation
18th Meeting: Teleconference, April 2020 2020-04-17 06:57
Abstract
This report summarises the activities of the AhG3 on Test model software development that has taken place between the 17th and 18th JVET meetings.
JVET-R0003 JVET AHG report: Test model software development (AHG3) [F. Bossen, X. Li, K. Sühring]

This report summarizes the activities of the AhG3 on Test model software development that has taken place between the 17th and 18th JVET meetings.

VTM software development

VTM 7.2 was tagged on Jan. 17, 2020.

VTM 7.3 was tagged on Jan. 20, 2020.

After one release candidate, VTM 8.0 was tagged on Feb. 22, 2020.

VTM 8.1 was tagged during the 18th JVET meeting.

The following tables show VTM 8.0 performance over HM 16.20:

 

 

All Intra

 

 

 

 

Over HM-16.20

 

 

Y

U

V

EncT

DecT

Class A1

-27.89%

-39.05%

-39.30%

1865%

221%

Class A2

-27.49%

-29.04%

-26.48%

2997%

238%

Class B

-20.99%

-32.87%

-37.24%

3361%

227%

Class C

-21.74%

-25.20%

-28.82%

4692%

224%

Class E

-25.16%

-31.46%

-30.65%

2667%

206%

Overall

-24.09%

-31.32%

-32.82%

3097%

224%

Class D

-17.64%

-19.95%

-20.14%

5303%

217%

Class F

-38.68%

-43.85%

-46.26%

5898%

215%

 

 

Random access

 

 

 

 

Over HM-16.20

 

 

Y

U

V

EncT

DecT

Class A1

-37.28%

-44.18%

-49.59%

951%

204%

Class A2

-41.45%

-46.23%

-44.78%

1080%

222%

Class B

-34.02%

-53.72%

-51.85%

991%

192%

Class C

-29.08%

-38.81%

-40.31%

1280%

200%

Class E

 

 

 

 

Overall

-34.84%

-46.33%

-46.91%

1070%

202%

Class D

-26.89%

-35.50%

-34.96%

1411%

203%

Class F

-40.62%

-49.10%

-50.32%

789%

167%

 

 

Low delay B

 

 

 

 

Over HM-16.20

 

 

Y

U

V

EncT

DecT

Class A1

 

 

 

 

 

Class A2

 

 

 

 

Class B

-30.05%

-46.77%

-45.16%

882%

192%

Class C

-28.10%

-33.08%

-33.34%

1015%

178%

Class E

-32.53%

-48.40%

-44.05%

423%

138%

Overall

-30.02%

-42.62%

-40.94%

769%

172%

Class D

-25.19%

-28.47%

-28.37%

1050%

189%

Class F

-41.83%

-49.84%

-49.94%

569%

140%

 

 

Low delay P

 

 

 

 

Over HM-16.20

 

 

Y

U

V

EncT

DecT

Class A1

 

 

 

 

 

Class A2

 

 

 

 

Class B

-34.44%

-49.05%

-47.56%

792%

199%

Class C

-29.84%

-33.27%

-33.61%

906%

187%

Decisions
noted
In the meeting discussion it was noted that CCALF had substantially changed the balance of luma and chroma fidelity. It was commented that this is discussed in JVET-R0076. The QP mapping table or an overall offset can be used to adjust this. Reducing lambda for luma and increasing it for chroma would also be a possibility. See further notes for the Friday 24 April plenary.
Citation
17th Meeting: Brussels, January 2020 2020-02-14 01:04
Abstract
This document provides general summary information about typical quality measurement practices for video coding experiments in recent work in MPEG and VCEG and their JVET and JCT-VC joint teams. In particular, it describes the use of Bjøntegaard Delta rate (BD-rate) measurements. It aims at providing a concept-level overview of recent practices and to provide some references to technical papers that describe further details. It provides comments on why some of the choices were made, and points out situations where caution must be taken when interpreting the results.
JVET-Q2016 Summary information on BD-rate experiment evaluation practices [K. Andersson, F. Bossen, J.-R. Ohm, A. Segall, R. Sjöberg, J. Ström, G. J. Sullivan] [WG 11 N19168] (2020-01-17)

Future meeting plans, expressions of thanks, and closing of the meeting

Future meeting plans were established according to the following guidelines:

  • Meeting under ITU-T SG 16 auspices when it meets (ordinarily starting meetings on the Tuesday of the first week and closing it on the Wednesday of the second week of the SG 16 meeting – a total of 9 meeting days), and
  • Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (ordinarily starting meetings on the Wednesday prior to such meetings and closing it at lunchtime on the last day of the WG 11 meeting – a total of 9.5 meeting days).

In cases where an exceptionally high workload is expected for a meeting, an earlier starting date may be defined.

Some specific future meeting plans (to be confirmed) were established as follows:

  • Wed. 15 – Fri. 24 April 2020, 18th meeting under WG 11 auspices in Alpbach, AT (post-meeting note: the planned Alpbach meeting was later converted to a teleconference-based meeting in response to the COVID-19 pandemic).
  • Tue. 23 June – Wed. 1 July 2020, 19th meeting under ITU-T auspices in Geneva, CH.
  • Wed. 7 – Fri. 16 October 2020, 20th meeting under WG 11 auspices in Rennes, FR.
  • Wed. 6 – Fri. 15 January 2021, 21st meeting under WG 11 auspices in Capetown, ZA.

The agreed document deadline for the 18thJVET meeting was planned to be Wednesday 8 April 2020. Only HLS topics were planned to be considered on...

Decisions
Minhua Zhou (Broadcom Corporation)
Citation
17th Meeting: Brussels, January 2020 2020-01-14 18:45
Abstract
This BoG is related to the Adaptive Colour space Transform (ACT). The BoG was held in Jan. 14th, from 2:00pm to 4:35pm.
JVET-Q0815 BoG on ACT [L. Zhang, X. Xiu] This BoG is related to the Adaptive Colour space Transform (ACT). The BoG discussion was held in Jan. 14th, from 1400 to 1635. This was reviewed in Track B, Wednesday 15 January 1520-1600. The following aspects that are related to ACT QP offset signalling and usage are summarized as follows: On signalling of ACT QP offsets Fixed QP offsets (-5, -5, -3) for JCCR off and -5 for JCCR On without any signalling: JVET-Q0098, JVET-Q0142, JVET-Q0241, JVET-Q0511 Global signalling of ACT QP offsets: JVET-Q0425, JVET-Q0510, JVET-Q0808 Signal in the PPS: JVET-Q0425, JVET-Q0510, JVET-Q0808 Signal offsets of the three-colour components respectively Signal offset for ACT and JCCR coded blocks Signal in SH: JVET-Q0808 Override mechanism On QP clipping in dequantization process Directly use (-5, -5, -3) for JCCR off and -5 for JCCR On, only lower bound is clipped:...
Decisions
Option 1 is mainly fixing bugs and simplifying. It was requested to provide text in a new input contribution (JVET-Q0820).
It was reminded that in cases where the JVET document is also made available as MPEG output document, a separate version under the MPEG document header should be generated. This version should be sent to GJS and JRO for upload.
Citation
17th Meeting: Brussels, January 2020 2020-01-09 08:15
Authors: Yago Sanchez HHI
Abstract
This contribution intends to provide a summary of all proposals on HRD
JVET-Q0743 AHG9: A summary of proposals on HRD [Y. Sanchez (HHI)] [late] This contribution was discussed Monday 13 January at ~1430 in Track A (chaired by GJS). This contribution provided a summary of some of the proposals on HRD. This summary was used for the reviewing of these proposals, such that the discussions could be in a more structured and efficient manner. Mandate a bitstream order for BP/PT/DUI SEI message that obeys the parsing dependency (Q0048)? Decision (expression of existing intent): Adopt. The exact expression may need some improvement. Not signal and infer cpb_removal_delay_delta_idx[ i ] to be 0 when there is only one cpb_removal_delay_delta[ i ] in BP SEI message? (Q0216)? Decision (cleanup): Adopt. Signal the alternative times in the PT SEI message for each sub-layer when sub-layer information is present instead of a single value (JVET-Q0219, JVET-Q0407)? Decision (...
Decisions
JVET-Q0283 and JVET-Q0397 and JVET-Q0404 were not included in the summary, and notes for these are below.
Citation
New Search