Search Results for "JVET-R0239"
Found 5 document(s)
Use number, keyword, author, or MPEG number. Filter by meeting when needed.
JVET-R0239 AHG9: Cleanups on signalling of tiles, slices, and subpictures [K. Zhang, L. Zhang, Y.-K. Wang, Z. Deng, J. Xu, H. Liu (Bytedance)]
Aspect 1 is no longer relevant because of the action taken for JVET-R0062. For aspects 2 and 5, see the the notes for JVET-R0415.
Aspects 3 and 4 were discussed on 24 April at 0900 UTC (chaired by GJS).
Aspect 3: When num_exp_tile_columns_minus1 is equal to PicWidthInCtbsY − 1, tile_column_width_minus1[ i ] is not signalled and inferred to be 0. Likewise, when num_exp_tile_rows_minus1 is equal to PicHeightInCtbsY − 1, tile_row_height_minus1[ i ] is not signalled and inferred to be 0. This aspect is for an unusual “corner case”, and it was agreed that no action is needed for it.
Aspect 4: The semantis of exp_slice_height_in_ctus_minus1[ i ] is clarified that exp_slice_height_in_ctus_minus1[ i ][ num_exp_slices_in_tile[ i ] − 1 ] is used to derive the uniform slice height, instead of specifying the height of the (num_exp_slices_in_tile[ i ] − 1) -th slice.
Decision (editorial bug fix / expression of existing intent): Adopt aspect 4.
Subpicture ID signalling (4)
JVET-R2016 Summary information on BD-rate experiment evaluation practices [K. Andersson, F. Bossen, J.-R. Ohm, A. Segall, R. Sjöberg, J. Ström, G. J. Sullivan, A. Tourapis] (2020-05-15)
Minor refinements of the description were planned.
Future meeting plans, expressions of thanks, and closing of the meeting
Future meeting plans were established according to the following guidelines:
- Meeting under ITU-T SG 16 auspices when it meets (ordinarily starting meetings on the Tuesday of the first week and closing it on the Wednesday of the second week of the SG 16 meeting – a total of 9 meeting days), and
- Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (ordinarily starting meetings on the Wednesday prior to such meetings and closing it at lunchtime on the last day of the WG 11 meeting – a total of 9.5 meeting days).
In cases where an exceptionally high workload is expected for a meeting, an earlier starting date may be defined.
Some specific future meeting plans (to be confirmed) were established as follows:
- Mon. 22 June – Wed. 1 July 2020, 19th meeting under ITU-T auspices conducted by teleconference.
- Wed. 7 – Fri. 16 October 2020, 20th meeting under WG 11 auspices in Rennes, FR.
- Wed. 6 – Fri. 15 January 2021, 21st meeting under WG 11 auspices in Capetown, ZA.
- Tue. 20 – Wed. 28 April 2021, 22nd meeting under ITU-T auspices in Geneva, CH.
The agreed document deadline for the 19th JVET meeting was planned to be Wednesday 10 June 2020 (earlier than usual).
Vittorio Baroncini, Andrew Segall, Mathias Wien, and Yan Ye were thanked for their efforts in further...
JVET-R0465 Crosscheck of JVET-R0328 (AHG 10: ALF and CCALF encoder parallel design) [G. Li (Tencent)] [late]
Metrics and evaluation criteria (0)
No contributions on this topic were noted.
Plenary meetings, joint meetings, BoG reports, and summary of actions taken
High-level syntax / systems relation meeting
This previously planned coordination session was cancelled due to a lack of identified need.
Plenary meeting Sunday 19 April 1300-1500
Reports of the tracks were presented as follows:
The status of Tracks A and B was presented and discussed, which particularly included the following aspects:
Track A:
Status of HLS review:
By the end of April 18, 2020, the meetings had reviewed approximately 172 (70%) of the 254 contributions, which resulted in 65 recommendations/adoptions for normative action, 26 recommendations/adoptions for editorial action, and 25 revisits.
- 6.1.1 Combinations of subpictures and other features (3/3): 1 recommendation, 2 revisits
- (done) 6.1.2.1 Chroma deblocking tc and β offsets signalling (13/13), 2 recommendations
- 6.1.2.2 Deblocking control signalling - other aspects (4/5): 2 recommendations, 1 TBP
- 6.1.2.3 Quantization control signalling (6/6): 1 adoption, 1 revisit
- (assigned to 4/21 #3) 6.1.2.4 High-level control of features that use APSs: LMCS, scaling lists, and ALF (17/21): 12 recommendations/adoptions, 1 revisit, 4 TBP.
- (assigned to 4/19 #3, 4/21 #3) 6.1.2.5 High level control of other tools (0/13): 13 TBP
- 6.1.3 General and misc. HLS topics (6/9): 3 recommendations/adoptions, 3 revisits, 3 TBP
- (assigned to 4/22 #1) 6.1.4 Profile, tier, level (PTL)...