Search Results for "JVET-R0107"

Found 4 document(s)

Search documents

Use number, keyword, author, or MPEG number. Filter by meeting when needed.

18th Meeting: Teleconference, April 2020 2020-04-11 03:36
Abstract
This contribution contains modifications related to the temporal sublayers information signalling in VPS and sub-bitstream extraction. Following is proposed:
JVET-R0107 AHG8/AHG9: On Temporal Sublayers Information [S. Deshpande, J. Samuelsson, A. Segall, P. Cowan (Sharp)]
References:
JVET-Q2001
Decisions
JVET-R0107 AHG8/AHG9: On Temporal Sublayers Information [S. Deshpande, J. Samuelsson, A. Segall, P. Cowan (Sharp)]
Citation
18th Meeting: Teleconference, April 2020 2020-05-17 19:13
Abstract
This document provides general summary information about typical quality measurement practices for video coding experiments in recent work in MPEG and VCEG and their JVET and JCT-VC joint teams. In particular, it describes the use of Bjøntegaard Delta rate (BD-rate) measurements. It aims at providing a concept-level overview of recent practices and to provide some references to technical papers that describe further details. It provides comments on why some of the choices were made and points at situations where caution must be taken when interpreting the results. Revision marks are shown relative to the January 2020 output document, JVET-Q2016-v4.
JVET-R2016 Summary information on BD-rate experiment evaluation practices [K. Andersson, F. Bossen, J.-R. Ohm, A. Segall, R. Sjöberg, J. Ström, G. J. Sullivan, A. Tourapis] (2020-05-15)

Minor refinements of the description were planned.

Future meeting plans, expressions of thanks, and closing of the meeting

Future meeting plans were established according to the following guidelines:

  • Meeting under ITU-T SG 16 auspices when it meets (ordinarily starting meetings on the Tuesday of the first week and closing it on the Wednesday of the second week of the SG 16 meeting – a total of 9 meeting days), and
  • Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (ordinarily starting meetings on the Wednesday prior to such meetings and closing it at lunchtime on the last day of the WG 11 meeting – a total of 9.5 meeting days).

In cases where an exceptionally high workload is expected for a meeting, an earlier starting date may be defined.

Some specific future meeting plans (to be confirmed) were established as follows:

  • Mon. 22 June – Wed. 1 July 2020, 19th meeting under ITU-T auspices conducted by teleconference.
  • Wed. 7 – Fri. 16 October 2020, 20th meeting under WG 11 auspices in Rennes, FR.
  • Wed. 6 – Fri. 15 January 2021, 21st meeting under WG 11 auspices in Capetown, ZA.
  • Tue. 20 – Wed. 28 April 2021, 22nd meeting under ITU-T auspices in Geneva, CH.

The agreed document deadline for the 19th JVET meeting was planned to be Wednesday 10 June 2020 (earlier than usual).

Vittorio Baroncini, Andrew Segall, Mathias Wien, and Yan Ye were thanked for their efforts in further...

Decisions
Tianyang Zhou (Sharp)
Citation
18th Meeting: Teleconference, April 2020 2020-04-17 17:06
Authors: G. Li Tencent Guichun Li
Abstract
This document reports the crosscheck results for JVET-R0328 "AHG 10: ALF and CCALF encoder parallel design". The software was studied, and the implementation is as described in JVET-R0328. The simulation results match with the results provided by the proponent.
JVET-R0465 Crosscheck of JVET-R0328 (AHG 10: ALF and CCALF encoder parallel design) [G. Li (Tencent)] [late]

Metrics and evaluation criteria (0)

No contributions on this topic were noted.

Plenary meetings, joint meetings, BoG reports, and summary of actions taken

High-level syntax / systems relation meeting

This previously planned coordination session was cancelled due to a lack of identified need.

Plenary meeting Sunday 19 April 1300-1500

Reports of the tracks were presented as follows:

The status of Tracks A and B was presented and discussed, which particularly included the following aspects:

Track A:

Status of HLS review:

By the end of April 18, 2020, the meetings had reviewed approximately 172 (70%) of the 254 contributions, which resulted in 65 recommendations/adoptions for normative action, 26 recommendations/adoptions for editorial action, and 25 revisits.

  1. 6.1.1 Combinations of subpictures and other features (3/3): 1 recommendation, 2 revisits
  2. (done) 6.1.2.1 Chroma deblocking tc and β offsets signalling (13/13), 2 recommendations
  3. 6.1.2.2 Deblocking control signalling - other aspects (4/5): 2 recommendations, 1 TBP
  4. 6.1.2.3 Quantization control signalling (6/6): 1 adoption, 1 revisit
  5. (assigned to 4/21 #3) 6.1.2.4 High-level control of features that use APSs: LMCS, scaling lists, and ALF (17/21): 12 recommendations/adoptions, 1 revisit, 4 TBP.
  6. (assigned to 4/19 #3, 4/21 #3) 6.1.2.5 High level control of other tools (0/13): 13 TBP
  7. 6.1.3 General and misc. HLS topics (6/9): 3 recommendations/adoptions, 3 revisits, 3 TBP
  8. (assigned to 4/22 #1) 6.1.4 Profile, tier, level (PTL)...
Decisions
It was reminded that in cases where the JVET document is also made available as MPEG output document, a separate version under the MPEG document header should be generated. This version should be sent to GJS and JRO for upload.
Citation
18th Meeting: Teleconference, April 2020 2020-04-06 21:57
Abstract
This contribution intends to provide a summary of proposals on scalability information signalling.
JVET-R0344 AHG9: A Summary of Proposals Related to Scalability Information Signalling [S. Deshpande (Sharp)] Discussed in AHG Session 1.3 Monday 7 April at 2100 (chaired by GJS, YKW & JRO). This contribution intends to provide a summary of proposals on scalability information signalling. Seventeen proposals from the category “4.3.1.2 Scalability information signalling and related” listed in a revision of JVET-R0339-v4 are included in this summary. Thus in v3, summary is added for JVET-R0158, JVET-R0199, and JVET-R0222 aspect 1. It is suggested that this summary be used for the reviewing of these proposals, such that the discussions may be done in a more structured and efficient manner. List of design questions Related to PTL information signalling Omit signalling of index to the list of PTL structures for output layer sets when number of signalled PTL structures is equal to total number...
Decisions
Discussion stopped here for JVET Track A on 19 April at 0900 UTC.
Citation
New Search