Search Results for "JVET-O0464"

Found 2 document(s)

Search documents

Use number, keyword, author, or MPEG number. Filter by meeting when needed.

15th Meeting: Gothenburg, SE, July 2019 2019-07-04 10:17
Abstract
In this contribution, it is proposed to unify the neighbouring reference positions for MPM list construction between the MIP-based intra block and the normal intra block. It is reportedly shown that the method provides overall BD-rate by 0.00%, -0.05%, 0.00% with 100% overall encoding time and 100% overall decoding time under All Intra (AI) configuration and -0.01%, -0.05%, -0.02% with 100% overall encoding time and 100% overall decoding time under Random Access (RA) configuration. Therefore, it is recommended to adopt the proposed method.
JVET-O0464 Non-CE3: Unification of Neighbouring Location for MPM List Construction [D. Kim, J. Jung, G. Ko, J. Son, J. Kwak (Wilus)]
Decisions
JVET-O0464 Non-CE3: Unification of Neighbouring Location for MPM List Construction [D. Kim, J. Jung, G. Ko, J. Son, J. Kwak (Wilus)]
Citation
15th Meeting: Gothenburg, SE, July 2019 2019-09-16 14:58
Abstract
This document defines Core Experiment 8 (CE8) on 4:4:4 screen content coding tools, to be performed for the upcoming Oct 2019 JVET meeting.
JVET-O2028 Description of Core Experiment 8 (CE8): 4:4:4 Screen Content Coding Tools [X. Xu, Y.-H. Chao, Y.-C. Sun, J. Xu]

It was noted that a CTC for 4:4:4 content has not been decided yet.

In the context of CE8, it was agreed that palette mode should be turned on in the anchors.

Future meeting plans, expressions of thanks, and closing of the meeting

Future meeting plans were established according to the following guidelines:

  • Meeting under ITU-T SG 16 auspices when it meets (ordinarily starting meetings on the Tuesday of the first week and closing it on the Wednesday of the second week of the SG 16 meeting – a total of 9 meeting days), and
  • Otherwise meeting under ISO/IEC JTC 1/SC 29/WG 11 auspices when it meets (ordinarily starting meetings on the Wednesday prior to such meetings and closing it at lunchtime on the last day of the WG 11 meeting – a total of 9.5 meeting days).

In cases where an exceptionally high workload is expected for a meeting, an earlier starting date may be defined. For the upcoming meeting in October 2019, the SG16 parent-level meeting dates had been shifted after the JVET and MPEG meeting plans were established, which has caused an additional adjustment in the JVET dates.

Some specific future meeting plans (to be confirmed) were established as follows:

  • Tue. 1 (afternoon) – Fri. 11 October 2019 (planned to close by 1400), 16th meeting under ITU-T auspices in Geneva, CH.
  • Wed. 8 – Fri. 17 January 2020, 17th meeting under WG 11 auspices in Brussels, BE.
  • Wed. 15 – Fri. 24 April 2020, 18th meeting under WG 11 auspices in Alpbach, AT.
  • Tue. 23 June – Wed. 1...
Decisions
Yun Zhou (ABS)
Citation
New Search