Back to Search
Document details
Crosscheck of JVET-R0358 (A combined solution for latency reduction in transformation process with TU-level signalling and removal of chroma LFNST)
Abstract
This contribution reports the results of the crosscheck of the JVET-R0401 (A combined solution for latency reduction in transformation process with TU-level signalling and removal of chroma LFNST).
JVET-R0401 Crosscheck of JVET-R0358 (A combined solution for latency reduction in transformation process with TU-level signalling and removal of chroma LFNST) [S. De-Luxán-Hernández (HHI)] [late]
Partitioning (5)
Contributions in this category were discussed Sunday 19 Apr. 0625–0705 and Monday 20 Apr. 0715-0830 in Track B (chaired by JRO).
References:
Decisions
Contributions in this category were discussed Sunday 19 Apr. 0625–0705 and Monday 20 Apr. 0715-0830 in Track B (chaired by JRO).
Citation