Back to Search Document details
42nd Meeting: Santa Eulària, ES, April 2026 2026-04-25 07:51
Non-EE2: Enhancement of Chroma MPM List Construction
Abstract
This proposal proposes to enhance the chroma MPM list construction, specifically, to modify the MPM list construction for non-CCP mode. The simulation results on top of ECM-19.1 are summarized as follows:
JVET-AP0181 Non-EE2: Enhancement of Chroma MPM List Construction [W. Niu, Z. Li, M. Jia, X. Zeng, S. Xie, Y. Bai (ZTE)]

This proposal proposes to enhance the chroma MPM list construction, specifically, to modify the MPM list construction for non-CCP mode. The simulation results on top of ECM-19.1 are summarized as follows:

AI: {-0.02%, 0.01%, -0.03%, 100.0x%, 100.8x%}

Gain is asserted to be too small to justify introduction of more candidates, which also increases decoding time.

Decisions
Gain is asserted to be too small to justify introduction of more candidates, which also increases decoding time.
Citation