JVET-AF0058 AHG12: GOP-based RPR encoder control for ECM [K. Andersson, J. Ström, R. Yu, W. Ahmad, P. Wennersten (Ericsson)]
GOP-based RPR encoder control has been available for VTM since VTM-19.0. It selects coding in a reduced resolution when impact of re-scaling performance between source resolution and reduced resolution is expected to be limited. ECM does not have such functionality. This contribution proposes to add the GOP-based RPR encoder control from VTM to ECM to enable further experimentation of RPR functionality in ECM.
Objective performance (BDR) for RA 4K resolutions and QP 40, 43, 47 and 50 is reported as:
ECM-10.0 with GOP-based RPR versus ECM-10.0: Y: -3.25%, U 5.95%, V 5.15%
VTM-22.0 with GOP-based RPR versus VTM-22.0: Y: -8.92%, U -3.38%, V -5.87%
Objective performance (BDR) for RA all resolutions and QP 40, 43, 47 and 50 is reported as:
ECM-10.0 with GOP-based RPR versus ECM-10.0: Y: -1.48%, U 2.37%, V 1.54%
VTM-22.0 with GOP-based RPR versus VTM-22.0: Y: -4.08%, U -2.82%, V -3.92%
It is noted that the benefit of using the GOP-based RPR encoder control in ECM is less compared to its usage in VTM but that it still shows promising coding gains at challenging bitrates.
It is also asserted that subjective quality can be improved by the proposal.
The QP values experimented here are not in RPR CTC.
GOP-based RPR in VTM is provided as an optional encoder control but not enabled in RPR CTC in the context of VTM.
If performance gain is the goal, then CTC should be used to conduct experiments.
Further study was recommended.
CTC for EE2/ECM and general ECM...
JVET-AG0116 AHG12: GOP-based RPR encoder control for ECM [K. Andersson, J. Ström, P. Wennersten, R. Yu, W. Ahmad (Ericsson)]
GOP-based RPR encoder control has been available for VTM since VTM-19.0. It selects coding in a reduced resolution when the PSNR impact of re-scaling from source resolution to reduced resolution is expected to be limited. ECM does not have such functionality. In JVET-AF0058 the GOP-based RPR encoder control was implemented in ECM and was demonstrated to show benefit for high QPs, but that contribution lacked results for CTC. The present contribution includes results on CTC.
Objective performance (BDR) is reported as:
ECM-11.0 with GOP-based RPR versus ECM-11.0:
- RA Y: -0,06%, U: 0,75%, V: 0,71%
- LDB Y: 0,01%, U: 0,09%, V: 0,03%
It is also asserted that subjective quality can be improved by the proposal.
It is proposed to add the GOP-based RPR encoder control from VTM to ECM to enable further experimentation of RPR functionality in ECM for improved coding efficiency.
In v2 results based on MS-SSIM were added.
- RA -0,29% 0,22% 0,05%
- LDB: -0,05% -0,03% -0,06%
The comparison performed in this contribution uses the normal CTC (rather than RPR CTC) as the anchor. The goal is to show that for 4K sequences, by switching the resolution on a GOP basis, a small luma performance gain can be achieved (though chroma performance loss is observed).
The proposed method is encoder only.
The proponent reported subjective improvement in offline viewing. No examples were provided in the contribution.
The cross checker suggests that the proposed change...
JVET-AF2033 Report of verification test on VVC multi-layer coding: Content layering [S. Iwamura, P. de Lagrange, M. Wien] [AG 5 N 105)] (2023-12-22)
This includes a description of the content layering functional test conducted during the 31st meeting, and the outcome.
Future meeting plans, expressions of thanks, and closing of the meeting
Future meeting plans were established according to the following guidelines (assuming face-to-face meetings):
- Meeting under ITU-T SG16 auspices when it meets (ordinarily starting meetings on the Tuesday or Wednesday of the first week and closing it on the Wednesday of the second week of the SG16 meeting – a total of 8-9 meeting days), and
- Otherwise meeting under ISO/IEC JTC 1/SC 29 auspices when its MPEG WGs meet (ordinarily starting meetings on the Thursday or Friday prior to the main week of such meetings and closing it on the same day as other MPEG WGs – a total of 8–9 meeting days).
In cases where an exceptionally high workload is expected for a meeting, an earlier starting date may be defined. In cases of online meetings, no sessions should be held on weekend days, such that meetings would typically start two days earlier.
Some specific future meeting plans (to be confirmed) were established as follows:
- During Wed. 17 – Fri. 19 and Mon. 22 – Fri. 26 January 2024, 33rd meeting under ISO/IEC JTC 1/SC 29 auspices, to be held as a teleconference meeting,
- During Wed. 17 – Wed. 24 April 2024, 34th meeting under ITU-T SG16 auspices in Rennes, FR,
- During Fri. 12 – Fri. 19 July 2024, 35thmeeting under ISO/IEC JTC 1/SC 29 auspices in Sapporo,...