Back to Search Document details
16th Meeting: Geneva, October 2019 2019-10-07 16:33
Crosscheck of JVET-P0592 AHG8/Non-CE1: Phase shifts for resampling
Authors: J. Luo Alibaba
Abstract
This contribution reports cross-check results for JVET-P0592, which signal luma and chroma phase shifts in PPS that are used for reference picture resampling and scalability by applying the phase shifts during motion compensation when scaling ratio is different from 1x. This cross-check report confirms the test results and specification changes provided in JVET-P0592.
JVET-P0902 Crosscheck of JVET-P0592 AHG8/Non-CE1: Phase shifts for resampling [J. Luo (Alibaba)]

CE2 related – Gradual decoding refresh (0)

No contributions on this subject were noted.

CE3 related – Intra prediction and mode coding (48)

Contributions in this category were reviewed in BoG JVET-P0969 (G. v. d. Auweera), unless noted otherwise.

References:
JVET-P0592
Decisions
noted
Contributions in this category were reviewed in BoG JVET-P0969 (G. v. d. Auweera), unless noted otherwise.
Citation