Abstract
This document reports on the work of the JVET ad hoc group on Project Management, including an overall status report on the VVC standardization project and the progress made during the interim period since the preceding meeting.
JVET-O0001 JVET AHG report: Project management (AHG1) [J.-R. Ohm, G. J. Sullivan]

This document reports on the work of the JVET ad hoc group on Project Management, including an overall status report on the VVC standardization project and the progress made during the interim period since the preceding meeting.

At the 14th meeting of the ITU-T/ISO/IEC Joint Video Experts Team (JVET), an ad hoc group on Project Management was established with the following mandates:

  • Coordinate overall JVET interim efforts.
  • Supervise CE and AHG studies.
  • Report on project status to JVET reflector.
  • Provide a report to next meeting on project coordination status.

The reflector used for discussions by the JVET and all of its AHGs is the JVET reflector:
jvet@lists.rwth-aachen.de. For subscription to this list, see
https://lists.rwth-aachen.de/postorius/lists/jvet.lists.rwth-aachen.de/.

The work of the JVET overall had proceeded well in the interim period with a huge number of input documents submitted to the current meeting. Intense discussion had been carried out on the group email reflector, and all output documents from the preceding meeting had been produced.

Output documents from the preceding meeting had been made available at the "Phenix" site (http://phenix.it-sudparis.eu/jvet/) or the ITU-based JVET site (http://wftp3.itu.int/av-arch/jvet-site/2019_03_ N_Geneva/), particularly including the following:

  • The meeting report (JVET-N1000) [Posted 2019-07-03]
  • Versatile Video Coding (Draft 5) (JVET-N1001) [Posted 2019-04-09, last update 2019-07-02]
  • Algorithm description for Versatile Video Coding and Test Model 5 (VTM 5) (JVET-N1002) [Posted 2019-05-21, last update 2019-06-11]
  • Guidelines for VVC software development (JVET-N1003) [Posted 2019-03-28]
  • Methodology and reporting template for coding tool testing (JVET-N1005) [Posted 2019-04-11]
  • JVET common test conditions and software reference configurations for SDR video (JVET-N1010) [Posted 2019-05-08]
  • JVET common test conditions and software reference configurations for HDR/WCG video (JVET-N1011) [Posted 2019-04-12]
  • Description of CE 1..11 (JVET-N1021..35) [all first posted 2019-03-27, further updates during the CE definition period of 3 weeks after the meeting]. The following CE description documents had later updates (more than 4 weeks after the meeting):

The seventeen ad hoc groups had made progress, and reports from those activities had been submitted.

Software integration of VTM was finalized approximately according to the plan.

Various problem reports relating to asserted bugs in the software, draft specification text, and reference encoder description had been submitted to an informal "bug tracking" system. That system is not intended as a replacement of our ordinary contribution submission process. However, the bug tracking system was considered to have been helpful to the software coordinators and text editors. The bug tracker reports had been automatically forwarded to the group email reflector, where the issues were discussed – and this is reported to have been helpful.

Roughly 900 input contributions to the current meeting (not counting the AHG and CE summary reports) had been registered for consideration at the meeting. Though topics of Core Experiments and related documents for the development of low-level coding tools reflect the bulk of these documents, around 120 documents were submitted on aspects of high-level syntax, including tile partitioning.

A preliminary basis for the document subject allocation and meeting notes for the 14th meeting had been made publicly available on the ITU-hosted ftp site.

Decisions
A preliminary basis for the document subject allocation and meeting notes for the 14th meeting had been made publicly available on the ITU-hosted ftp site.
Citation