Back to Search Document details
14th Meeting: Geneva, March 2019 2019-03-19 10:06
Crosscheck of JVET-N0365 (CE6-related: MPM based non-separable secondary transform)
Abstract
This document reports the crosscheck of JVET-N0365. It is reported that the average BD-rates match those provided by the proponents. No discrepancies have been found between the provided software and the description of the tests. The execution times are within the measurement error range.
JVET-N0518 Crosscheck of JVET-N0365 (CE6-related: MPM based non-separable secondary transform) [P. Philippe (Orange bcom)] [late]
Decisions
JVET-N0518 Crosscheck of JVET-N0365 (CE6-related: MPM based non-separable secondary transform) [P. Philippe (Orange bcom)] [late]
Citation