Back to Search Document details
13th Meeting: Marrakech, January 2019 2019-01-13 17:13
Crosscheck of JVET-M0528 (Non-CE3: A unified luma intra mode list construction process)
Authors: Jie Yao Fujitsu
Abstract
This contribution reports crosscheck results of JVET-M0528(A unified luma intra mode list construction process). It is reported that the proposed method provides an average luma BD rate performance of -0.07% AI, x.xx% RA, x.xx% LDB with 100%/101% AI, xxx%/xxx% RA, xxx%/xxx% LDB encoding/decoding time over VTM-3.0.
JVET-M0626 Crosscheck of JVET-M0528 (Non-CE3: A unified luma intra mode list construction process) [J. Yao (Fujitsu)] [late]
References:
JVET-M0528
Decisions
JVET-M0626 Crosscheck of JVET-M0528 (Non-CE3: A unified luma intra mode list construction process) [J. Yao (Fujitsu)] [late]
Citation