Back to Search Document details
34th Meeting: Rennes, FR, April 2024 2024-04-19 10:22
Crosscheck of JVET-AH0181 (AHG12: Adaptation of intra/inter LFNST/NSPT for low-delay configuration)
Abstract
This contribution is a cross-check report of JVET-AH0181 that proposes an adaptation of intra/inter LFNST/NSPT for low-delay configuration in the context of Exploration Experiments 2 (JVET-AF2024). The cross-checker confirms that the software provided by the proponents matches the algorithm description of JVET-AH0181. All the testing results in this cross-check report match those provided by the proponent.
References:
Citation